Asphalt Crack Seal


Asphalt Crack Seal
The Asphalt Crack Seal program began in 1997 with contracts from the Division of Facilities and Construction Management (DFCM) and the Utah Department of Transportation (UDOT).

The Crack Seal Crew consists of a supervisor and 5 to 6 inmates. The equipment consists of a self-contained vehicle that includes a tar pot, compressor, tools and equipment along with materials for a full day of continuous crack sealing.

The crew performs repairs on roads and streets as well as parking lots and pathways. Our crack seal crew have also worked in many of the state parks throughout Utah including areas as far away as Kanab and Escalante.

During the colder winter months, the crews perform construction for UCI and a number of projects for UDOT.